DEVELOPMENT OF BRIDGES

Engaged in a wide range of charitable and social welfare activities for the society with no discrimination as to sex, caste, creed, color and religion.

Projects In Hand

Nand-Nagroun Bridge

Sai Eternal Foundation is executing the work of “Construction of 387.00 metres span expansion joint double lane Bridge i.e. footpath on back water of Govind Sager Lake at Nand-Nagroun including 400 metre approaches towards Jhandutta side and 90 metre approaches towards Jejwin side. The bridge consist of five spans consisting of three spans of 101.84 m, left bank span 44.87 m and right bank span 33.40 m.

Kothipattan Bridge

Sai Eternal Foundation is executing the work of “160 metres Span (Double lane) Bridge with footpath over River Beas at Kothipattan on Dharampur Sandhole road via Seoh Langana. The bridge span consists of one 102.83 m span (expansion joint) and one 57.17 m span (of expansion joint).

The Company has constructed about 40 km of hydro & highway tunnels in the difficult terrains of Himalayan geology.