SALE OF ENERGY
SALE OF ENERGY
Nand-Nagroun Bridge
The Company and its subsidiaries are generating renewable energy i.e.,
hydro power projects. The Company sells electricity (Green Energy) back to grid
and receive payment on this account. The excess of income over expenditure is
being utilised for implementation of renewable energy projects including Hydro
Power Projects and undertaking the various activities of the Foundation.
Kothipattan Bridge
Sai Eternal Foundation is executing the work of “160 metres Span (Double lane) Bridge with footpath over River Beas at Kothipattan on Dharampur Sandhole road via Seoh Langana. The bridge span consists of one 102.83 m span (expansion joint) and one 57.17 m span (of expansion joint).
Kothipattan Bridge
Sai Eternal Foundation is executing the work of “160.00 metres Span (Doublelane) Bridge with footpath over River Beas at Kothipattan on Dharampur Sandhole road via SeohLangana. The bridge span consists of one 102.83 m span (expansion joint) and one 57.17 m span (of expansion joint).